subject
Mathematics, 18.10.2020 15:01 Usman458

A company produces two models of calculators at two different plants. In one day Plant A can produce 140 of Model 1 and 35 of Model 2. In one day Plant B can produce 60 of Model 1
and 90 of Model 2. If the company needs to produce at least 460 Model 1 and 340 of Model 2,
find the minimum cost. Assume it costs $1200 per day to operate Plant A and $900 per day for
Plant B.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, alott1121
How to write 3 tenths and 5 tenths as a decimal
Answers: 2
image
Mathematics, 21.06.2019 18:30, zoeatlowapple
An optical inspection system is used to distinguish among different part types. the probability of a correct classification of any part is 0.92. suppose that three parts are inspected and that the classifications are independent. let the random variable x denote the number of parts that are correctly classified. determine the probability mass function of x. round your answers to four decimal places (e. g. 98.7654). x f(x) 0 1 2 3
Answers: 2
image
Mathematics, 21.06.2019 19:30, marvin07
Anna is constructing a line segment that is congruent to another segment ab. for the construction, which tool should be used to mesure segment ab
Answers: 1
image
Mathematics, 21.06.2019 20:00, shayshayyy41
For what type of equity loan are you lent a lump sum, which is to be paid within a certain period of time? a. a line of credit b. equity c. a second mortgage d. an amortization
Answers: 3
You know the right answer?
A company produces two models of calculators at two different plants. In one day Plant A can produc...

Questions in other subjects:

Konu
Mathematics, 01.12.2021 17:40
Konu
Spanish, 01.12.2021 17:40
Konu
Mathematics, 01.12.2021 17:40
Konu
Mathematics, 01.12.2021 17:40
Konu
English, 01.12.2021 17:40