subject
Mathematics, 16.10.2020 14:01 MyaMya12

What is 40 percent of 50?
1. 20
2. 30
3. 40
4. 10

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 02:00, AnastasiaJauregui
If p(x) is the total value of the production when there are x workers in a plant, then the average productivity of the workforce at the plant is a(x) = p(x) x . (a) find a'(x). a'(x) = xp'(x) − p(x) x a'(x) = xp'(x) − p(x) x2 a'(x) = p'(x) − p(x) x a'(x) = xp'(x) − p'(x) x2 a'(x) = p'(x) − xp(x) x2 why does the company want to hire more workers if a'(x) > 0? a'(x) > 0 ⇒ a(x) is ; that is, the average productivity as the size of the workforce increases. (b) if p'(x) is greater than the average productivity, which of the following must be true? p'(x) − xp(x) > 0 p'(x) − xp(x) < 0 xp'(x) − p'(x) > 0 xp'(x) − p(x) < 0 xp'(x) − p(x) > 0
Answers: 2
image
Mathematics, 22.06.2019 03:00, danielroytman1
Step by step explanation pls for 10 pts the length of a rectangular board is 3 feet less than twice its width. a second rectangular board is such that each of its dimensions is the reciprocal of the corresponding dimensions of the first rectangular board. if the perimeter of the second board is one-fifth the perimeter of the first, what is the perimeter of the first rectangular board?  
Answers: 1
image
Mathematics, 22.06.2019 04:00, lnr919
Which is an equivalent equation solved for r? the circumference of a circle can be found using the formula c = 2πr. r=cπ r=c(2π) r= c over 2π r= 2π over c
Answers: 1
image
Mathematics, 22.06.2019 05:30, rossy84
The odometer on a car shows 132.8 miles traveled. find the greatest possible error of the measurement. a. 0.5 b. 0.05 c. 0.005 d. 0.06
Answers: 1
You know the right answer?
What is 40 percent of 50?
1. 20
2. 30
3. 40
4. 10...

Questions in other subjects:

Konu
Geography, 16.12.2019 08:31
Konu
Mathematics, 16.12.2019 08:31