Mathematics, 13.10.2020 15:01 PinkDivaGirl02

A clothing manufacturer makes coats, shirts, and slacks. The time required for cutting, sewing, and packaging each item is shown in the table. How many of each should be made to use all available labor hours?
coats
shirts
slacks
Coats
Shirts
Slacks
20 min
15 min
Cutting
Sewing
Packaging
10 min
24 min
Time available
135 hr
320 hr
81 hr
60 min
30 min
5 min
12 min
6 min
ges/Alamy

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, veronica25681
(6.03) what is the constant term in the expression 6x3y + 7x2 + 5x + 4? (input a numeric value only.) numerical answers expected! me pls! fast pls
Answers: 3
image
Mathematics, 21.06.2019 17:00, nihadsalim10
Find the roots of the equation below. x^2 - 6 + 9 = 0
Answers: 1
image
Mathematics, 21.06.2019 18:30, isabellacampos4586
It took alice 5 5/6 hours to drive to her grandparents' house for . on the way home, she ran into traffic and it took her 7 3/8 hours. how much longer did the return trip take? write your answer as a proper fraction or mixed number in simplest form. the trip home took __hours longer. ?
Answers: 1
image
Mathematics, 21.06.2019 21:00, cjgonzalez981
Type the correct answer in each box. use numerals instead of words. if necessary, use / fir the fraction bar(s). the graph represents the piecewise function: h
Answers: 3
You know the right answer?
A clothing manufacturer makes coats, shirts, and slacks. The time required for cutting, sewing, and...

Questions in other subjects: