subject
Mathematics, 06.10.2020 14:01 24lbriscoe

Your company bids on two contracts. You believe the probability that you get the first contract is 0.75 and if you get the first contract the probability that you also get the second one is 0.4. If you do not get the first contract the probability that you get the second one is 0.45. If you get both contracts the profit will be $75,000 for the company, if you get only one the profit will be $15,000. It costs the company $10,000 per contract to make a bid. What is the expected profit for the company? A) -$20,000
B) $8,187.50
C) $33,687.50
D) $28,187.50

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, kadams3836
The length of a rectangular piece of land is 92 yards more than three times its width. the perimeter is 760 yards. find its dimensions.
Answers: 1
image
Mathematics, 21.06.2019 23:00, ptrlvn01
1. an economy consists of three workers: larry, moe, and curly. each works 10 hours a day and can produce two services: mowing lawns and washing cars. in an hour, larry can either mow one lawn or wash one car; moe can either mow one lawn or wash two cars; and curly can either mow two lawns or wash one car. a. calculate how much of each service is produced under the following circumstances: a. all three spend all their time mowing lawns. b. all three spend all their time washing cars. c. all three spend half their time on each activity d. larry spends half of his time on each activity, while moe only washes cars and curly only mows lawns b. using your answers to part a, draw a production possibilities frontier and label points a, b, c, and d on your graph. explain why the production possibilities frontier has the shape it does. c. are any of the allocations calculated in part a inefficient? explain.
Answers: 3
image
Mathematics, 22.06.2019 01:10, zacharynugent
Simplify each expression. use positive exponents. show work . (x –2 y –4 x 3 ) –2
Answers: 2
image
Mathematics, 22.06.2019 01:40, ashleygarcia0884
At wind speeds above 1000 centimeters per second (cm/sec), significant sand-moving events begin to occur. wind speeds below 1000 cm/sec deposit sand and wind speeds above 1000 cm/sec move sand to new locations. the cyclic nature of wind and moving sand determines the shape and location of large dunes. at a test site, the prevailing direction of the wind did not change noticeably. however, the velocity did change. fifty-nine wind speed readings gave an average velocity of x = 1075 cm/sec. based on long-term experience, σ can be assumed to be 245 cm/sec. (a) find a 95% confidence interval for the population mean wind speed at this site. (round your answers to the nearest whole number.) lower limit cm/sec upper limit cm/sec
Answers: 2
You know the right answer?
Your company bids on two contracts. You believe the probability that you get the first contract is 0...

Questions in other subjects: