subject
Mathematics, 29.09.2020 08:01 Jerjer3864

The number of tons of rock, t, mined from a quarry depends on the number of workers, w. The equation below models the relationship. t = 184w + 852 How many workers will it take to mine 4,900 tons of rock? O A. 14 B. 22 C. 28 OD. 31

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, joel3410
Beth makes batches of bluberry muffins and banna muffins. each batchis 6 muffins. she makes 2.5 batches of bluberry muffins. how many batches of bananna muffins should beth make if she wants to have a total of 60 muffins?
Answers: 1
image
Mathematics, 22.06.2019 03:30, em6maw
Find the sixth term of the following geometric sequence.
Answers: 1
image
Mathematics, 22.06.2019 03:30, ericchen4399
Can someone tell me if these are correct?
Answers: 2
image
Mathematics, 22.06.2019 05:30, jwunder5859
The result of which expression will best estimate the actual product of (-4/5) x (3/5) x (-6/7) x (5/6) (i need an expression not an answer)
Answers: 2
You know the right answer?
The number of tons of rock, t, mined from a quarry depends on the number of workers, w. The equation...

Questions in other subjects:

Konu
Mathematics, 28.04.2021 16:10
Konu
Mathematics, 28.04.2021 16:10
Konu
Law, 28.04.2021 16:10
Konu
Physics, 28.04.2021 16:10