During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800
mg of Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The
information for the concrete shows that 25-75 mg/kg per day is the appropriate
mixture consistency. Are the workers within the desired rang?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, 0145813
Answer this question, only if you know the answer. 30 points and brainliest!
Answers: 1
image
Mathematics, 21.06.2019 19:00, jackieanguiano3700
Solve the problem. a student earned grades of c, a, b, and a in four different courses. those courses had these corresponding numbers of credit hours: 4, 5, 1, and 5. the grading system assigns quality points to letter grades as follows: a = 4, b = 3, c = 2, d = 1, and f = 0. compute the grade point average (gpa) and round the result to two decimal places. 3.40 3.50 8.75 2.18
Answers: 1
image
Mathematics, 21.06.2019 21:00, moneybaggzay123
X+y=-4 x-y=2 use elimination with adding and subtraction
Answers: 3
image
Mathematics, 21.06.2019 21:00, lunnar2003
Graph the system of inequalities presented here on your own paper, then use your graph to answer the following questions: y < 4x − 8 y is greater than or equal to negative 5 over 2 times x plus 5 part a: describe the graph of the system, including shading and the types of lines graphed. provide a description of the solution area. (6 points) part b: is the point (5, −8) included in the solution area for the system? justify your answer mathematically. (4 points)
Answers: 3
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed...

Questions in other subjects:

Konu
Mathematics, 13.04.2021 03:30