subject
Mathematics, 21.09.2020 04:01 bethdove9466

A ship must be unloaded by two cranes in 12 hours. Both cranes worked for 8 hours and then one of them broke. The rest of the work was done by the other crane in 7 hours. How long would each crane take to do the entire job if it was working alone? Thank you!

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:40, hdbug2025
Marya wants to factor the polynomial 36x^3 -22x^2 - 144x. which term can she add to the polynomial that would not change its grestest common factor? check all that apply
Answers: 3
image
Mathematics, 21.06.2019 16:30, happy121906
Astandard american eskimo dog has a mean weight of 30 pounds with a standard deviation of 2 pounds. assuming the weights of standard eskimo dogs are normally distributed, what range of weights would 99.7% of the dogs have? approximately 26–34 pounds approximately 24–36 pounds approximately 28–32 pounds approximately 29–31 pounds
Answers: 1
image
Mathematics, 21.06.2019 17:50, domiyisthom
On a string instrument, the length of a string varies inversely as the frequency of its vibrations. an 11-inch string has a frequency of 400 cylces per second. find the frequency of a 10-icnch string.
Answers: 2
image
Mathematics, 21.06.2019 19:00, ellie4678
Me with geometry ! in this figure, bc is a perpendicular bisects of kj. dm is the angle bisects of bdj. what is the measure of bdm? •60° •90° •30° •45°
Answers: 2
You know the right answer?
A ship must be unloaded by two cranes in 12 hours. Both cranes worked for 8 hours and then one of th...

Questions in other subjects:

Konu
English, 01.06.2021 20:50