Mathematics, 20.09.2020 07:01 valerrry

A construction worker estimates that a kitchen remodel will take 1 person 200 hours. If 5 people work on the job for 8 hours a day, how many days will it take for them to complete the job?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:20, girlydiy17
Thompson and thompson is a steel bolts manufacturing company. their current steel bolts have a mean diameter of 127 millimeters, and a variance of 36. if a random sample of 35 steel bolts is selected, what is the probability that the sample mean would differ from the population mean by greater than 0.5 millimeters? round your answer to four decimal places.
Answers: 3
image
Mathematics, 22.06.2019 00:00, kimberly185
In a timed typing test lara typed 63 words per minute. estimate the number of words she should be able to type in half in hour show your work
Answers: 2
image
Mathematics, 22.06.2019 00:40, Hjackson24
What is the interquartile range (iqr) of the data set represented by this box plot?
Answers: 3
image
Mathematics, 22.06.2019 02:00, kiekie1986
If the angle bisectors of a pair of opposite angles of a quadrilateral are the opposite sides of a parallelogram formed by the two angle bisectors and two sides of the quadrilateral, is the quadrilateral always a parallelogram? explain your answer.
Answers: 3
You know the right answer?
A construction worker estimates that a kitchen remodel will take 1 person 200 hours. If 5 people wor...

Questions in other subjects:

Konu
Mathematics, 19.09.2021 05:10