Mathematics, 20.09.2020 03:01 twixer29
During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of bentonite to be mixed with 198 lb of concrete mixed every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range?
Answers: 1
Mathematics, 21.06.2019 18:30, nativebabydoll35
How do you solving the solution of each system using elimination?
Answers: 2
Mathematics, 21.06.2019 19:00, brighamc23
Draw a scaled copy of the circle using a scale factor of 2
Answers: 1
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...