subject
Mathematics, 30.08.2020 01:01 kamerin46

A small production manager accepted a project that would require 32 hours to complete with a compensation rate of $28/hour. After calculating costs for allocating resources to the project and accounting for paying employees for the project, the manager determined it would cost $17/hour for the company to complete the project. How much profit should the manager's company expect to make given these numbers? (You do not need to include the units. You only need to enter your answer as a number.)

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:00, neariah24
Of the 304 people who attended a school play, 5/8 were students. how many of the people who attended were students.
Answers: 1
image
Mathematics, 22.06.2019 01:00, zuleromanos
If log_3(x)=4.5 and log_3(y)=3, what is log_3(x^2/y)? a. 3b. 6.75c. 6d. 1.5
Answers: 2
image
Mathematics, 22.06.2019 01:30, lyndah15
Here are the 30 best lifetime baseball batting averages of all time, arranged in order from lowest to highest: 0.319, 0.329, 0.330, 0.331, 0.331, 0.333, 0.333, 0.333, 0.334, 0.334, 0.334, 0.336, 0.337, 0.338, 0.338, 0.338, 0.340, 0.340, 0.341, 0.341, 0.342, 0.342, 0.342, 0.344, 0.344, 0.345, 0.346, 0.349, 0.358, 0.366 if you were to build a histogram of these data, which of the following would be the best choice of classes?
Answers: 3
image
Mathematics, 22.06.2019 04:10, cravens511peeelg
Lian is deciding which of two gyms to join. each gym charges a monthly rate plus a one-time membership fee. lian correctly wrote and solved a system of linear equations by substitution to compare the costs of the memberships. in her work, she substituted an expression for one variable and solved for the other. this resulted in the equation 75 = 75. what can lian conclude? one gym charges $75 per month. each gym charges $75 per month both gyms charge the same monthly rate and the same membership fee. both gyms charge the same monthly rate, but not the same membership fee.
Answers: 3
You know the right answer?
A small production manager accepted a project that would require 32 hours to complete with a compens...

Questions in other subjects: