subject
Mathematics, 03.08.2020 14:01 heroicblad

After you have made your table, use it to construct a histogram of the data, choosing the height of the bar so that the area of each bar matches the relative frequency of your bin. Show all necessary calculations and use graph paper for your histogram to make sure that the vertical scale is consistent and correct.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:50, COOLIOMARIS
Do a swot analysis for the business idea you chose in question 2 above. describe at least 2 strengths, 2 weaknesses, 2 opportunities, and 2 threats for that company idea. (1-8 sentences. 4.0 points)
Answers: 1
image
Mathematics, 21.06.2019 17:10, sujeyribetanco2216
The average number of vehicles waiting in line to enter a parking lot can be modeled by the function f left parenthesis x right x squared over 2 left parenthesis 1 minus x right parenthesis endfraction , where x is a number between 0 and 1 known as the traffic intensity. find the rate of change of the number of vehicles waiting with respect to the traffic intensity for the intensities (a) xequals0.3 and (b) xequals0.6.
Answers: 1
image
Mathematics, 21.06.2019 19:00, tanaemichel
John used linear combination to solve the system of equations shown. he did so by multiplying the first equation by -3 and the second equation by another number to eliminate the x-terms. what number did jonas multiply the second equation by? 4x-6y=23x+5y=11
Answers: 2
image
Mathematics, 21.06.2019 20:50, brea2006
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
You know the right answer?
After you have made your table, use it to construct a histogram of the data, choosing the height of...

Questions in other subjects: