Mathematics, 01.08.2020 17:01 JustTraaash
The structural engineering design section within the engineering department of a regional electrical utility corporation has developed several standard designs for a group of similar transmission line towers. The detailed design for each tower is based on one of the standard designs. A transmission line project involving 50 towers has been approved. The estimated number of engineering hours needed to accomplish the 8 th and 50th tower are 108 hours and 94.3 hours respectively. Determine the learning curve percentage and estimate of the number of engineering hours needed to design the 10th tower in the project
Answers: 2
Mathematics, 21.06.2019 15:00, angie07253
Brady has a 20 year fixed rate mortgage for $215,500 with monthly payments of 1,305.89.the annual interest rate is 4%. what is the total cost of the principal and interest for this loan rounded to the nearest dollar
Answers: 3
Mathematics, 21.06.2019 19:30, fraven1819
:24% of students in a class are girls. if there are less than 30 students in this class, how many students are there? how many girls are there?
Answers: 2
Mathematics, 21.06.2019 20:00, lattimorekeonna1
Find the least common multiple of the expressions: 1. 3x^2, 6x - 18 2. 5x, 5x(x +2) 3. x^2 - 9, x + 3 4. x^2 - 3x - 10, x + 2 explain if possible
Answers: 1
The structural engineering design section within the engineering department of a regional electrical...
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Mathematics, 11.09.2020 14:01
Health, 11.09.2020 14:01
Geography, 11.09.2020 14:01