A contractor originally estimated the total cost of a job including labor and materials at $ 57,000. In reviewing the costs, a new estimate of $ 48,000 is made, reducing the labor cost by 15% and the material cost by 18%. What is each cost, labor and material, of the new estimate?
Answers: 1
Mathematics, 21.06.2019 15:40, xxaurorabluexx
What is the distance between the points 4,10 and -3,-14 on the coordinate plane
Answers: 2
Mathematics, 21.06.2019 16:20, kingalex7575
Browning labs is testing a new growth inhibitor for a certain type of bacteria. the bacteria naturally grows exponentially each hour at a rate of 6.2%. the researchers know that the inhibitor will make the growth rate of the bacteria less than or equal to its natural growth rate. the sample currently contains 100 bacteria. the container holding the sample can hold only 300 bacteria, after which the sample will no longer grow. however, the researchers are increasing the size of the container at a constant rate allowing the container to hold 100 more bacteria each hour. they would like to determine the possible number of bacteria in the container over time. create a system of inequalities to model the situation above, and use it to determine how many of the solutions are viable.
Answers: 1
Mathematics, 21.06.2019 17:00, carebear147
You have a 32-foot fence around a square garden. there are 4 equal sections. you paint 13 of one section of the fence. what fraction of the fence did you paint? you have a 32-foot fence around a square garden. there are 4 equal sections. you paint 13 of one section of the fence. what fraction of the fence did you paint?
Answers: 2
A contractor originally estimated the total cost of a job including labor and materials at $ 57,000....