subject
Mathematics, 27.06.2020 23:01 amaya171

The Siler Construction Company is about to bid on a new industrial construction project. To formulate their bid, the company needs to estimate the time required for the project. Based on past experience, management expects that the project will require at least 24 months, and could take as long as 48 months if there are complications. The most likely scenario is that the project will require 30 months. (a) Assume that the actual time for the project can be approximated using a triangular probability distribution. What is the probability that the project will take less than 30 months? If required, round your answer to two decimal places. (b) What is the probability that the project will take between 28 and 32 months? If required, round your answer to four decimal places. (c) To submit a competitive bid, the company believes that if the project takes more than 36 months, then the company will lose money on the project. Management does not want to bid on the project if there is greater than a 25% chance that they will lose money on this project. Should the company bid on this project? - Select your answer -

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, GreenHerbz206
Mr switzer needs to buy new 1-foot tiles to cover his bathroom floor. the floor is 12 feet long and 8 feet wide. each square foot of tile will cost $1.79. in dollars what will be the total cost of the tiles he needs to buy.
Answers: 3
image
Mathematics, 21.06.2019 18:30, leannhb3162
The bake stars picked 907 apples last weekend at a local orchard they made caramel apples and sold them in the bakery in trays of 6
Answers: 1
image
Mathematics, 21.06.2019 18:40, jeffljr2718
Will gve pints stars and brainliest
Answers: 1
image
Mathematics, 22.06.2019 00:00, minecraftsam2018
What is the effect on the graph of the function f(x) = x2 when f(x) is changed to f(x) − 4?
Answers: 1
You know the right answer?
The Siler Construction Company is about to bid on a new industrial construction project. To formulat...

Questions in other subjects:

Konu
Mathematics, 19.01.2021 14:00
Konu
Chemistry, 19.01.2021 14:00