subject
Mathematics, 26.06.2020 16:01 mkingston1705

on monday, it took 3 builders 5 1/2 hours to build a wall. an identical wall needs to be built on tuesday and 5 builders are available. each builder is paid £8.90 for each hour they work. work out how much each builder will be paid for the work completed on tuesday

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, babyduck0664
Find the height of a square pyramid that has the volume of 32 ft.³ and a base lengthof 4 feet
Answers: 1
image
Mathematics, 21.06.2019 16:00, baby851
What is the sum of these mixed numbers 2 1/8 + 4 3/8
Answers: 1
image
Mathematics, 21.06.2019 18:30, KTgodlencorgi
David is spreading mulch on a triangular area of his flower bed. the coordinates of the vertices of the area are (1, 3), (9, 3), and (4, 6). what is the area of the triangle if each square has an area of 3 square feet?
Answers: 1
image
Mathematics, 21.06.2019 18:30, anabellabenzaquen
The volume of a sphere is increased by 6%. calculate the corresponding percentage increased in it area.
Answers: 3
You know the right answer?
on monday, it took 3 builders 5 1/2 hours to build a wall. an identical wall needs to be built on tu...

Questions in other subjects:

Konu
Mathematics, 08.06.2020 23:57
Konu
English, 08.06.2020 23:57
Konu
Mathematics, 08.06.2020 23:57