subject
Mathematics, 24.06.2020 08:01 yclark98563p5z2gt

A construction worker pulls a five-meter plank up the side of a building under construction by means of a rope tied to one end of the plank (see figure). Assume the opposite end of the plank follows a path perpendicular to the wall of the building and the worker pulls the rope at a rate of 0.19 meter per second. How fast is the end of the plank sliding along the ground when it is 2.3 meters from the wall of the building? (Round your answer to two decimal places.) ? m/sec

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 00:00, xcorojm
What is the value of the product (3-2i)(3+2i)?
Answers: 2
image
Mathematics, 22.06.2019 00:10, chloeholt123
What 8/12+8/11 in another way than and improper fraction
Answers: 2
image
Mathematics, 22.06.2019 02:30, Ailyt2543
From a party ,lori made a fruit punch from 1 gallon of orange juice ,2 quarts of grape juice,5 pints of pineapple juice, and 12 cups of cranbarry juice order the juice from least to greatest amount used in the fruit punch
Answers: 3
image
Mathematics, 22.06.2019 02:40, tgentryb60
A) find the derivative of the inverse to f(x) = 3x + sint at x 6. b) (cale) find the derivative of the inverse to f(x)+3sin at x 6. if x +2y -34, ind he behaviar of the cure at 4,.3), c) a. increasing, concave up d. decreasing, concave down b. increasing, concave down e. decreasing, inflection point c. decreasing, concave up
Answers: 2
You know the right answer?
A construction worker pulls a five-meter plank up the side of a building under construction by means...

Questions in other subjects: