subject
Mathematics, 17.06.2020 23:57 kourismith13

WILL GIVE BRAINLIEST IF FULL COMPLETE CORRECT ANSWER IS GIVEN. Sarah has some large, polygon-shaped cardboard cutouts that she needs to sort, because she wants to hang them in her geometry classroom. The first division she needs to make is to divide the regular polygons from the irregular ones. In order to save time measuring all angles and sides of each polygon, and owing to the size and number of sides/angles in each shape, Sarah decides to measure just one angle in each polygon. Consider the following angle measures for polygons A through T, and answer the following questions.
a. If each angle measure represented an exterior measure of its polygon, which of the polygons could be regular? Explain your answers.

b. If each angle measure represented an exterior measure of a regular polygon, name each polygon by using its number of sides. (For any figure with more than 12 sides, just use the number: e. g. 45-gon.)

c. If each angle measure represented an interior measure of its polygon, which of the polygons could be regular? Explain your answers.

d. If each angle measure represented an interior measure of its polygon, which of the polygons do we know are convex? Explain your answers.


WILL GIVE BRAINLIEST IF FULL COMPLETE CORRECT ANSWER IS GIVEN.

Sarah has some large, polygon-shap

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, angie07253
Amuffin recipe, which yields 12 muffins, calls for cup of milk for every 1 cups of flour. the same recipe calls for cup of coconut for every cup of chopped apple. to yield a batch of 30 muffins, how much flour will be needed in the mix?
Answers: 1
image
Mathematics, 21.06.2019 19:00, LoneWolves
What is x and y intercepts for y=x+7
Answers: 1
image
Mathematics, 21.06.2019 23:30, ramandeep
Write a similarity statement for the similar triangles. afgh ~ a
Answers: 1
image
Mathematics, 22.06.2019 05:30, OrionGaming
The daily production of a company is modeled by the function p = -w^2 + 75w - 1200. the daily production, p, is dependent on the number of workers (w) present. if the break-even point is when p=0, what are the least and greatest number of workers the company must have present each day in order to break even? 50 points! will give brainliest!
Answers: 1
You know the right answer?
WILL GIVE BRAINLIEST IF FULL COMPLETE CORRECT ANSWER IS GIVEN. Sarah has some large, polygon-shaped...

Questions in other subjects: