subject
Mathematics, 10.06.2020 23:57 kdawg203

Triangle MNO is reflected over the x- axis and then translated up 4 and right 3 How can the transformation be ashamed such the translation can occur before the reflection and have the image remain in the same position?

A. Translate the pre- image down 4 and right 3 and then reflect over the the x- axis.

B. Translate the pre-image up 3 and right 4 and then reflect the figure over the x-axis

C. Translate the pre-image up 4 and 3 left and then reflect the figure over the y-axis

D. Translate the pre-image down 3 and right 4 and then reflect the figure over the x-axis


Triangle MNO is reflected over the x- axis and then translated up 4 and right 3

How can the trans

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, darlene1283
Thales was an ancient philosopher familiar with similar triangles. one story about him says that he found the height of a pyramid by measuring its shadow and his own shadow at the same time. if the person is 5-ft tall, what is the height of the pyramid in the drawing?
Answers: 3
image
Mathematics, 21.06.2019 18:40, mia12340
The vertex of this parabola is at (-2,-3). when the x-value is -1, the y-value is -5. what is the coefficient of the squared expression in the parabola's equation?
Answers: 2
image
Mathematics, 21.06.2019 21:30, sandersmakaylaovq5vu
Rhombus adef is inscribed into a triangle abc so that they share angle a and the vertex e lies on the side bc . what is the length of the side of the rhombus if ab=c, and ac=b.
Answers: 1
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Triangle MNO is reflected over the x- axis and then translated up 4 and right 3 How can the transfo...

Questions in other subjects:

Konu
Mathematics, 12.12.2020 16:50