Mathematics, 08.06.2020 10:57 dtrdtrdtrdtrdrt1325
On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufacture a pair of running shoes. How often will it take the factory more than 27 minutes to manufacture a pair of running shoes?
Note: Assume that a Normal model is appropriate for the distribution of manufacturing times.
A.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 47.5% of the time.
B.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 2.5% of the time.
C.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 95% of the time.
D.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 5% of the time.
Answers: 1
Mathematics, 21.06.2019 16:40, madisongibson62
What is the distance between the points (2 -3) and (-6 4) on the coordinate plane
Answers: 1
Mathematics, 21.06.2019 18:00, bvaughn6477
Clara schumann is buying bagels for her coworkers, she buys a dozen bagels priced at $5.49 a dozen. the bakery's cost for making the bagels is $2.25 per dozen. what is the markup rate based on selling price on a dozen bagels?
Answers: 1
Mathematics, 21.06.2019 21:50, Animallover100
What is the missing reason in the proof? segment addition congruent segments theorem transitive property of equality subtraction property of equality?
Answers: 3
On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufactu...
Physics, 31.08.2019 13:10
Chemistry, 31.08.2019 13:10
Mathematics, 31.08.2019 13:10
Physics, 31.08.2019 13:10
English, 31.08.2019 13:10
English, 31.08.2019 13:10