subject
Mathematics, 07.06.2020 04:01 darkmatter1210

The expected duration of the project (average) is 30 days and variance is 16. 1. What is the probability that the project will be completed on day 32 or earlier? 2. Suppose the official deadline for the project is 34 days. What is the probability that the project will be delayed?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:20, kaylaxocald
Se tiene en una caja de canicas 10, 4 blancas y 6 negras ¿cual es la probabilidad que en 2 extracciones con reemplazo sean blancas? ¿cual es la probalidad que en 2 extracciones sin reemplazo sean negras?
Answers: 1
image
Mathematics, 22.06.2019 00:30, desiree6005
Triangle abc has side lengths: ab = 3.5  cm, bc = 2.4 cm, and ac = 4.2 cmδabc ≅ δhjkwhat is the length of side hj?
Answers: 1
image
Mathematics, 22.06.2019 00:50, ladnerhailey16
Assume that adults have iq scores that are normally distributed with a mean of mu equals 100 and a standard deviation sigma equals 20. find the probability that a randomly selected adult has an iq between 80 and 120.assume that adults have iq scores that are normally distributed with a mean of mu equals 100 and a standard deviation sigma equals 20. find the probability that a randomly selected adult has an iq between 80 and 120.
Answers: 3
image
Mathematics, 22.06.2019 02:40, corbino710
On which number line are -3 and its opposite shown
Answers: 3
You know the right answer?
The expected duration of the project (average) is 30 days and variance is 16. 1. What is the probabi...

Questions in other subjects:

Konu
English, 08.09.2020 20:01