subject
Mathematics, 05.06.2020 18:02 aramirez4785

At a furniture manufacturer, worker A can assemble a shelving unit in 5 hours. Worker B can assemble the same shelving unit in 3 hours. Which equation can be used to find t, the time in hours it takes for worker A and worker B to assemble a shelving unit together? Rate
(Shelving Units per Hour)
Time
(Hours)
Fraction Completed
Worker A
One-fifth
t

Worker B
One-third
t

5 t + 3 t = 1
One-fifth t minus one-third t = 1
One-fifth t + one-third t = 1
5 t minus 3 5 = 1

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, emilyblaxton
Kayla and alberto are selling fruit for a school fundraiser. customers can buy small boxes of grapefruit and large boxes of grapefruit. kayla sold 3 small boxes of grapefruit and 1 large box of grapefruit for a total of $65. alberto sold 1 small box of grapefruit and 1 large box of grapefruit for a total of $55. what is the cost each of one small box of grapefruit and one large box of grapefruit?
Answers: 1
image
Mathematics, 21.06.2019 21:00, cjgonzalez981
Type the correct answer in each box. use numerals instead of words. if necessary, use / fir the fraction bar(s). the graph represents the piecewise function: h
Answers: 3
image
Mathematics, 21.06.2019 21:40, arubright177
The tile along the edge of a triangular community pool needs to be replaced? ?
Answers: 2
image
Mathematics, 21.06.2019 22:00, Drax152
Determine which postulate or theorem can be used to prove that lmn =nmo
Answers: 3
You know the right answer?
At a furniture manufacturer, worker A can assemble a shelving unit in 5 hours. Worker B can assemble...

Questions in other subjects:

Konu
English, 02.12.2021 14:00
Konu
Social Studies, 02.12.2021 14:00