subject
Mathematics, 31.05.2020 05:01 Trendymwah4211

A scatterplot is used to display data for a runner where x is the number of miles run, and y is the time, in minutes, that it takes to run that distance.
Which interpretation describes a line of best fit of y = 9.5x for the data in the scatterplot?
For each 1 minute, the runner ran 9.5 miles.
For each 9.5 minutes, the runner ran 1 mile.
The minimum distance with a recorded time is 9.5 miles.
The maximum distance with a recorded time is 9.5 miles.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, 19thomasar
The blue whale is the largest animal living on the earth. the average blue whale measures 100 feet long (30 meters) and weighs 300,000 pounds (136,000 kilograms). a whale’s head is 1⁄3 of the length of its body. a new baby whale is 1⁄4 the length of a grown whale. the average man is 1⁄17 the length of a blue whale, and 1⁄1,818 its weight. a human baby measures 1⁄4 of the length of an adult. calculate the following information: how long is a whale’s head? how long is a new baby whale? how tall is the average man? how much does the average man weigh? how tall is the average human baby?
Answers: 3
image
Mathematics, 21.06.2019 20:30, jonmorton159
Aword processing program requires a 7- digit registration code made up of the digits 1,2,4,5,6,7 and 9 each number has to be used and no number can be used mor than once how many codes are possible
Answers: 1
image
Mathematics, 21.06.2019 20:40, alasia559
Askate shop rents roller skates as shown on the table below. which graph and function models this situation?
Answers: 1
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
A scatterplot is used to display data for a runner where x is the number of miles run, and y is the...

Questions in other subjects:

Konu
Mathematics, 24.10.2019 08:43
Konu
Chemistry, 24.10.2019 08:43