subject
Mathematics, 31.05.2020 00:00 destinyaus14

Some Field Experience in the use of an Accelerated Method in Estimating 28-Day Strength of Concrete" considered regressing y =28-day standard-cured strength (psi) against x =accelerated strength (psi). Suppose the equation of the true regression line is y =1800 +1.3x.

a. What is the expected value of 28-day strength when accelerated strength= 2500? (2 marks)

b. By how much can we expect 28-day strength to change when accelerated strength increases by 1 psi? (4 marks)

c. Answer part (b) for an increase of 100 psi. (2 marks)

d. Answer part (b) for a decrease of 100 ps

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, squawk1738
What is the exact volume of the cylinder (radius 13 in., height 30 in.)
Answers: 1
image
Mathematics, 21.06.2019 18:30, santiagobermeo32
What is the value of x in the following equation? -3x-2=2x+8
Answers: 1
image
Mathematics, 21.06.2019 21:40, salinasroel22
In a survey of 1015 adults, a polling agency asked, "when you retire, do you think you will have enough money to live comfortably or not. of the 1015 surveyed, 534 stated that they were worried about having enough money to live comfortably in retirement. construct a 90% confidence interval for the proportion of adults who are worried about having enough money to live comfortably in retirement.
Answers: 3
image
Mathematics, 21.06.2019 22:00, emadrid76
  cassidy wants to cut the yellow fabric into strips that are 0.3 yards wide. how many strips of yellow fabric can cassidy make? yellow fabric 16 yards for $108.00.
Answers: 1
You know the right answer?
Some Field Experience in the use of an Accelerated Method in Estimating 28-Day Strength of Concrete"...

Questions in other subjects:

Konu
Mathematics, 29.01.2020 13:45
Konu
Chemistry, 29.01.2020 13:45