Mathematics, 22.05.2020 15:59 ryleeyeagley03
Sporting Equipment, Inc. makes two types of balls: Soccer balls and Cork balls. The making of each soccer ball and cork ball requires 3 hours and 4 hours of production time, respectively. For the next month, the total production hours of 500 are available. Also, the combined production quantity for these two balls must be at least 150 units. The objective for this linear programming model is to fulfil the given production requirements at a minimum cost. The production cost for each Soccer ball is S7 and each Cork ball is $9.
1. Formulate the problem, using the following decision variables:
S = number of Soccer balls manufactured
C = number of Cork balls manufactured
2. The objective function is:
A. Maximize 9S + 7C
B. Minimize 7S + 9C
C. Minimize 9S + 7C
D. Maximize 7S + 9C
3. The constraint equation for the production hours is:
A. 3S + 4C >= 500
B. 4S + 3C <= 500
C. 4S + 3C <= 500
D. 3S + 4C <= 500
4. The constraint equation for the combined production quantity is:
A. S + C <= 150
B. S + C >= 150
C. S + C = 150
D. S + C =/150
5. If the company produces 100 soccer balls and 50 cork balls, the cost of production is:
a. $1250 b. $1350 c. $1150 d. $2000
Answers: 3
Mathematics, 21.06.2019 16:50, jennamae9826
Its worth 10000000 points need asap if you answer correctly ill mark brainliest
Answers: 1
Sporting Equipment, Inc. makes two types of balls: Soccer balls and Cork balls. The making of each s...
Geography, 18.08.2019 12:30
History, 18.08.2019 12:30
Mathematics, 18.08.2019 12:30
Social Studies, 18.08.2019 12:30
English, 18.08.2019 12:30
Biology, 18.08.2019 12:30