subject
Mathematics, 19.05.2020 16:57 khushboogarg3877

A construction company has to complete a project no later than 4 months from now or there will be significant cost overruns. The manager of the construction company believes that there are four possible values for the random variable X, the number of months from now it will take to complete this project: 2, 2.5, 3, and 3.5. It is currently believed that the probabilities of these four possibilities are .4, .3, .2, and .1, respectively. What is the expected completion time (in months) of this project from now?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, miriamnelson7545
△cde maps to △stu with the transformations (x, y) arrowright (x − 2, y − 2) arrowright (3x, 3y) arrowright (x, −y). if cd = a + 1, de = 2a − 1, st = 2b + 3 and tu = b + 6, find the values of a and b. the value of a is and the value of b is .
Answers: 1
image
Mathematics, 21.06.2019 16:00, ktprada
You use math in day-to-day routines when grocery shopping, going to the bank or mall, and while cooking. how do you imagine you will use math in your healthcare career?
Answers: 1
image
Mathematics, 21.06.2019 21:20, Hazard970
If two angles of a triangle have equal measures and the third angle measures 90°, what are the angle measures of the triangle? a. 60°, 60°, 60° b. 45°, 90°, 90° c. 30°, 30°, 90° d. 45°, 45°, 90°
Answers: 2
image
Mathematics, 21.06.2019 22:30, cramirezorozco392
Whit h equation best represents this situation the number 98 increased by an unknown number equal to 120
Answers: 1
You know the right answer?
A construction company has to complete a project no later than 4 months from now or there will be si...

Questions in other subjects:

Konu
Mathematics, 19.05.2021 18:10
Konu
English, 19.05.2021 18:10