subject
Mathematics, 19.05.2020 15:14 aaliyah80

A plumber laying five hundred meters of drain pipe requires twenty men working for ten days. What length in meters would be laid by fifty men in five days?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, 30valgolden
Complete the truth table a. t, f, f, t b. t f f f c. f t f t d f t f t
Answers: 1
image
Mathematics, 21.06.2019 15:50, jetblackcap
If n stands for number sold and c stands for cost per item, in which column would you use the formula: ? a. column d c. column f b. column e d. column g
Answers: 1
image
Mathematics, 21.06.2019 19:40, evarod
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
image
Mathematics, 21.06.2019 20:30, NetherisIsTheQueen
What is always true about a positive integer raised to a negative odd power?
Answers: 1
You know the right answer?
A plumber laying five hundred meters of drain pipe requires twenty men working for ten days. What le...

Questions in other subjects:

Konu
Mathematics, 06.12.2021 01:00