subject
Mathematics, 05.05.2020 20:36 whitwelllife

A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $7/unit of Product A and a profit of $4/unit of Product B. To manufacture a unit of Product A requires 6 min on Machine I and 5 min on Machine II. To manufacture a unit of Product B requires 9 min on Machine I and 4 min on Machine II. There are 5 hr of machine time available on Machine I and 3 hr of machine time available on Machine II in each work shift. How many units of each product should be produced in each shift to maximize the company's profit

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:40, nicole5918
Which of the following are accepted without proof in a logical system? check all that apply.
Answers: 1
image
Mathematics, 21.06.2019 20:00, helplessstudent3
You are shooting hoops after school and make 152 out of a total of 200. what percent of shots did you make? what percent did you miss? show proportion(s).
Answers: 1
image
Mathematics, 22.06.2019 00:30, victoria8281
Which ordered pair identifies a point in quadrant iv? a) (2, 5) b) (0, 1) c) (-1, -1) d) (12, -5) which quadrant is (-4,-6) in? a) i. b) ii. c) iii. d) iv.
Answers: 3
image
Mathematics, 22.06.2019 02:50, ryanez5306
Aci is desired for the true average stray-load loss μ (watts) for a certain type of induction motor when the line current is held at 10 amps for a speed of 1500 rpm. assume that stray-load loss is normally distributed with σ = 2.3. (round your answers to two decimal places.)
Answers: 1
You know the right answer?
A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It...

Questions in other subjects:

Konu
Mathematics, 08.03.2020 16:51