subject
Mathematics, 05.05.2020 19:33 opreston

A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 15% of bags are over-filled then they stop production to fix the machine. They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 100 bags and finds that 21 of them are over-filled. He plans to test the hypotheses H 0: p = 0.15 versus H a : p > 0.15. What is the test statistic?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, mdaniella522
7(x - 2) = 3(x + 4) solve the following equation. then enter your answer in the space provided using mixed number format.
Answers: 2
image
Mathematics, 21.06.2019 18:30, liliaboop9325
The lengths of two sides of a right triangle are given. find the length of the third side. round to the nearest tenth if necessary. a) y = 12/5x + 39/5 b) y = 5/12x + 5/39 c) y = 12/5x - 39/5 d) y = 5/12x - 5/39
Answers: 2
image
Mathematics, 21.06.2019 18:30, amorosoavap5cejz
You receive 15% of the profit from a car wash how much money do you receive from a profit of 300
Answers: 2
image
Mathematics, 22.06.2019 01:30, manlyman31
What type of symmetry does a rhombus have?
Answers: 1
You know the right answer?
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags o...

Questions in other subjects: