subject
Mathematics, 05.05.2020 19:05 msladycie8831

Chapin Manufacturing Company operates 24 hours a day, five days a week. The workers rotate shifts each week. Management is interested in whether there is a difference in the number of units produced when the employees work on various shifts. A sample of five workers is selected and their output recorded on each shift.

Units Produced

Employee Day Afternoon Night

Skaff 38 24 34

Lum 35 23 37

Clark 28 26 38

Treece 35 26 23

Morgan 22 23 24

1. At the 0.01 significance level, can we conclude there is a difference in the mean production rate by shift or by employee?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, tmrsavage02p7cj16
Ageologist had two rocks on a scale that weighed 4.6 kilograms together. rock a was 0.5 of the total weight. how much did rock a weigh?
Answers: 1
image
Mathematics, 21.06.2019 21:30, achsahjosey
Acyclist bike x distance at 10 miles per hour .and returns over the same path at 8 miles per hour. what is the cyclist average rate for the round trip in miles per hour ?
Answers: 1
image
Mathematics, 22.06.2019 00:00, Jasoncookies23
Awindow has the shape of a rectangle with a semi circle at the top. find the approximate area of the window using the dimensions shown. 4ft by 8ft
Answers: 1
image
Mathematics, 22.06.2019 00:20, ashtonviceoxd21i
Submarines control how much they float or sink in the ocean by changing the volume of air and water contained in large ballast tanks. when the tanks are completely full of water, the submarine increases its overall mass and sinks down to the bottom. when the tanks are completely full of air, the submarine reduces its overall mass and floats to the surface. depending on the density of the seawater surrounding the submarine, it will pump seawater in or out of the tanks in order to achieve the same overall density as the sea water and float neutrally in the water. the volume of the submarine never changes. when the tanks are completely full of water, a submarine with a volume of 7.8\times10^3\text{ m}^37.8×10 3 m 3 7, point, 8, times, 10, start superscript, 3, end superscript, space, m, start superscript, 3, end superscript has a total mass of 8\times10^6\text{ kg}8×10 6 kg8, times, 10, start superscript, 6, end superscript, space, k, g. the density of the seawater is 10^3\text{ kg/m}^310 3 kg/m 3 10, start superscript, 3, end superscript, space, k, g, slash, m, start superscript, 3, end superscript. to make that submarine float neutrally, and neither float nor sink in the ocean, what volume of water does that submarine need to subtract from its tanks?
Answers: 1
You know the right answer?
Chapin Manufacturing Company operates 24 hours a day, five days a week. The workers rotate shifts ea...

Questions in other subjects:

Konu
History, 19.05.2020 15:32
Konu
Mathematics, 19.05.2020 15:32
Konu
Mathematics, 19.05.2020 15:32
Konu
Mathematics, 19.05.2020 15:32
Konu
Mathematics, 19.05.2020 15:32