subject
Mathematics, 05.05.2020 22:16 zacharoo10

The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and absorption of 4.2%, and 899 lb/yd3 of sand having a moisture content of 5.7% and absorption of 1.4%, and 244 lb/yd3 of free water. What is the weight of the mixing water per cubic yard that should be used at the job site?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:10, sarah19Nursing
Which function has the domain x> -11?
Answers: 1
image
Mathematics, 21.06.2019 20:30, anniekwilbourne
Kayla made observations about the sellin price of a new brand of coffee that sold in the three different sized bags she recorded those observations in the following table 6 is $2.10 8 is $2.80 and 16 is to $5.60 use the relationship to predict the cost of a 20oz bag of coffee.
Answers: 3
image
Mathematics, 21.06.2019 20:30, shan6171
Acircle has a circumference of 7.850 units. what is its radius?
Answers: 2
image
Mathematics, 21.06.2019 20:50, karaisabelhill
Find the missing variable for a parallelogram: a = latex: 32in^2 32 i n 2 h = b = 6.3 in (1in=2.54cm)
Answers: 2
You know the right answer?
The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and a...

Questions in other subjects:

Konu
Mathematics, 03.11.2020 21:20
Konu
Mathematics, 03.11.2020 21:20
Konu
Mathematics, 03.11.2020 21:20