subject
Mathematics, 06.05.2020 04:20 jjimenez0276

A construction company has an expenditure rate of E'(x)=e^(0.17 x) dollars per day on a particular paving job and an income rate of I'(x)=116.2 - e^(.17x) dollars per day on the same job, where x is the number of days from the start of the job. The company's profit on that job will equal total income less total expenditures. Profit will be maximized if the job ends at the optimum time, which is the point where the two curves meet.
(a) Find the optimum number of days for the job to last.
(b) Find the total income for the optimum number of days.
(c) Find the total expenditures for the optimum number of days.
(d) Find the maximum profit for the job.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, Mariaisagon9050
Will give brainliest plz hurry lexie surveyed 4 teenagers to find out approximately how many hours, per week, they read for fun, and how many siblings they have. brooke said she reads about 10 h a week for fun, and that she has 5 siblings. celia said she has 1 brother and 1 sister and reads for fun about 3 h each week. henry said he has 2 brothers and reads for fun about 30 min each week. jude said he doesn't read for fun and has 3 brothers and 3 sisters. use this information to complete the data table. express your answers as whole numbers or decimals. name hours of fun number of siblings brooke celia __ henry jude
Answers: 2
image
Mathematics, 21.06.2019 19:30, clay373
1. are the corresponding angles congruent 2. find the ratios of the corresponding sides 3. is triangle jkl congruent to triangle rst? if so what is the scale factor
Answers: 1
image
Mathematics, 21.06.2019 20:00, lwaites18
Bernice paid $162 in interest on a loan of $1800 borrowed at 6%. how long did it take her to pay the loan off?
Answers: 1
image
Mathematics, 21.06.2019 21:50, edjiejwi
Aline passes through the point (–7, 5) and has a slope of 1/2 which is another point that the line passes through?
Answers: 3
You know the right answer?
A construction company has an expenditure rate of E'(x)=e^(0.17 x) dollars per day on a particular p...

Questions in other subjects: