subject
Mathematics, 06.05.2020 07:33 riley111111111111111

The production constraints for a toy car and truck company are given by the equations and graph of the system of inequalities.

Production Constraints:
Wheels: The company has no more than 360 wheels in stock. Each toy car needs 4 wheels, and each toy truck needs 6 wheels.
Seats: The company has no more than 100 seats in stock. Each toy car needs 2 seats, and each toy truck needs 1 seat.

4x + 6y ≤ 360
2x + y ≤ 100

What is the combined maximum number of toy cars and toy trucks the company can produce?

A) 50
B) 60
C) 70
D) 110

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, christpress0
Find the sum to the equation 3+6+9+
Answers: 1
image
Mathematics, 21.06.2019 20:00, Abdirisack3250
How to find the exponential function y=ca^x, with points (1,2) and (2,1)
Answers: 2
image
Mathematics, 21.06.2019 22:20, stalley1521
Which of the following is missing in the explicit formula for the compound interest geometric sequence below?
Answers: 1
image
Mathematics, 21.06.2019 22:20, skyhighozzie
(b) suppose that consolidated power decides to use a level of significance of α = .05, and suppose a random sample of 100 temperature readings is obtained. if the sample mean of the 100 temperature readings is x⎯⎯ = 60.990, test h0 versus ha and determine whether the power plant should be shut down and the cooling system repaired. perform the hypothesis test by using a critical value and a p-value. assume σ = 5. (round your z to 2 decimal places and p-value to 4 decimal places.)
Answers: 2
You know the right answer?
The production constraints for a toy car and truck company are given by the equations and graph of t...

Questions in other subjects:

Konu
History, 12.04.2021 20:30
Konu
Geography, 12.04.2021 20:30