subject
Mathematics, 25.04.2020 22:13 chloeozenghar1

A project can be completed by 8 workers in 30 days. In order to complete the project sooner, the company plans to hire additional workers. How many total workers are needed to complete the project in 16 days?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, nevaehkb
Just tell me how to set up the equation.
Answers: 2
image
Mathematics, 21.06.2019 18:30, Karinaccccc
Astick 2 m long is placed vertically at point b. the top of the stick is in line with the top of a tree as seen from point a, which is 3 m from the stick and 30 m from the tree. how tall is the tree?
Answers: 2
image
Mathematics, 21.06.2019 19:30, alanaruth3389
Consider a cube that has sides of length l. now consider putting the largest sphere you can inside this cube without any point on the sphere lying outside of the cube. the volume ratio -volume of the sphere/ volume of the cube is 1. 5.2 × 10−1 2. 3.8 × 10−1 3. 1.9 4. 2.5 × 10−1 5. 3.8
Answers: 2
image
Mathematics, 21.06.2019 22:20, daisa02
Cone a has a surface area of 384 ft2 and cone b has a surface area of 96 ft? . what is the ratio of their volume?
Answers: 1
You know the right answer?
A project can be completed by 8 workers in 30 days. In order to complete the project sooner, the com...