subject
Mathematics, 23.04.2020 20:43 vcortez

A construction company with two black hose has contracted to dig a long trench for drainage pipes the larger black who can dig the entire trench by it self in 12 days the smaller Bracco can dig the entire trench by his self in 14 days the large black oh begins working on the trench by the south but after seven days it is transferred to a different job and a smaller black hole begins working on the trench how long will take the smaller bike how to complete the job

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, abbas7777
While scuba diving, rajeev dove to a depth of 12.6 feet below the surface of the water and then descended another 8.7 feet. what expression can be used to find rajeev's new position? 12.6 – 8.7 –12.6 – 8.7 –12.6 – (–8.7) 12.6 – (–8.7)
Answers: 2
image
Mathematics, 21.06.2019 21:00, tttyson
God's gym charges a sign-up fee of $100 plus $30 per month. write an expression to represent how much someone would pay for a membership.
Answers: 1
image
Mathematics, 21.06.2019 21:10, elnkun98owvaa6
The equation |pl = 2 represents the total number of points that can be earned or lost during one turn of a game. which best describes how many points can be earned or lost during one turn? o o -2 2 oor 2 -2 or 2 o
Answers: 1
image
Mathematics, 21.06.2019 23:30, kodak0531
What is the arc length of the subtending arc for an angle of 72 degrees on a circle of radius 4? o a. 8a oc. 16 t d. 8
Answers: 3
You know the right answer?
A construction company with two black hose has contracted to dig a long trench for drainage pipes th...

Questions in other subjects:

Konu
Biology, 22.09.2019 02:30