subject
Mathematics, 23.04.2020 09:00 samueldfhung

The line plot shows the number of hours students in Mrs. Timberlake’s class worked on a project.

A line plot titled Hours Spent on Project. A number line goes from 1 to 5 and represents the number of hours. There are 3 marks above 1, 2 above 2, 5 above 3, 3 above 4, 2 above 5.

How many students are included in the data?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, sara24starling
Find the x-intercept and y-intercept of the line. 3x + 5y = −15
Answers: 1
image
Mathematics, 21.06.2019 17:30, rosie20052019
One positive number is 9 more than twice another. if their product is 95, find the numbers
Answers: 1
image
Mathematics, 21.06.2019 19:30, iloading5117
Carlos spent 1 1/4 hours doing his math homework he spent 1/4 of his time practicing his multiplication facts how many hours to carlos been practicing his multiplication facts
Answers: 2
image
Mathematics, 21.06.2019 19:40, josecano2
Which of the following could be the ratio of the length of the longer leg 30-60-90 triangle to the length of its hypotenuse? check all that apply. a. 313 6 b. 3: 215 c. 18: 13 d. 1: 13 e. 13: 2 of. 3: 15
Answers: 3
You know the right answer?
The line plot shows the number of hours students in Mrs. Timberlake’s class worked on a project.

Questions in other subjects:

Konu
Chemistry, 25.05.2021 21:50