subject
Mathematics, 17.04.2020 21:11 jahmanilittlejotz1pe

Some Field Experience in the use of an Accelerated Method in Estimating 28-Day Strength of Concrete" considered regressing y =28-day standard-cured strength (psi) against x =accelerated strength (psi). Suppose the equation of the true regression line is y =1800 +1.3x.

a. What is the expected value of 28-day strength when accelerated strength= 2500? (2 marks)
b. By how much can we expect 28-day strength to change when accelerated strength increases by 1 psi? (4 marks)
c. Answer part (b) for an increase of 100 psi. (2 marks)
d. Answer part (b) for a decrease of 100 ps

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, sciencecreation87
Two planes leave an airport at the same time, one flying east, the other flying west. the eastbound plane travels 20 mph slower. they are 1600 mi apart after 2 hr. find the speed of each plane.
Answers: 1
image
Mathematics, 21.06.2019 17:00, shayambros
How to solve a simultaneous equation involved with fractions?
Answers: 1
image
Mathematics, 21.06.2019 19:00, hiddenauthors436
Ineed to know the answer to this algebra question.
Answers: 1
image
Mathematics, 21.06.2019 21:00, noahdwilke
What is the unit rate of, 75% high fiber chimp food to 25% high protein chimp food.
Answers: 1
You know the right answer?
Some Field Experience in the use of an Accelerated Method in Estimating 28-Day Strength of Concrete"...

Questions in other subjects:

Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01
Konu
Spanish, 15.09.2020 22:01
Konu
Mathematics, 15.09.2020 22:01