subject
Mathematics, 17.04.2020 17:08 Greghairston4839

HELP I need this finished today and is 100 points! It is a box and whisker plot that needs to show work. I have 1 and 2 done but need to actually do the problem portion.

The problem solving template is a tool which can be used to help solve difficult problems. For this sample work you will use the problem solving template to set up and then solve the equation. Complete each part of the template for the question and then solve the question with work shown in the “Do” square.

Create a box and whisker plot with the data given above. Find and label the quartile 1, median (quartile 2), quartile 3, minimum, and maximum. If you would prefer to draw this on your own paper, please take a picture/scan it and upload in the Drop Box. Identify(1pt) : What is the problem? What do you need to find or do? What will your final answer look like? Do you understand what is being asked and what you need to do?

Think(1pt) : What have they told you? What does it mean? What more do you know or can you figure out? What connections can you make? Do you have a list of things you know, ideas to try & a plan for doing it?
Do(5pts) : Solve by showing steps towards completing the problem, including writing/using equations. Revise your plan if it doesn’t work the first time. Check your work. No guess and check.
Answer(3pts) : Look back at your work and answer – does it make sense, answer all of the questions, and is reasonable (accurate)? Organize and report your work and final answer. (The box-and-whisker plot shown is not to scale).


HELP I need this finished today and is 100 points! It is a box and whisker plot that needs to show w

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, juli8350
The average hourly earnings for a construction worker is projected to be $24.50 in 2012. jason wants to join the construction work force after he graduates in 2012. his friend tells him that average hourly earnings for construction workers will rise by 2% from 2009 to 2012. based on the data below, assuming that the projected hourly earnings are correct, is jason’s friend’s statement accurate? construction industry - average hourly earnings, 2000-2009 a. his friend’s statement is accurate. the average hourly earnings will increase by 2%. b. his friend’s statement is not accurate. the percent increase will be more than 2% c. his friend’s statement is not accurate. the percent increase will be less than 2% d. his friend’s statement is not accurate. the average hourly earnings will decrease
Answers: 3
image
Mathematics, 21.06.2019 22:40, zmzmzmzmz2975
If f(x) = 3x2 - 2x+4 and g(x) = 5x + 6x - 8, find (f-g)(x).
Answers: 1
image
Mathematics, 22.06.2019 01:50, QueensQueens
Lesson 9-3 for items 8-10, a square is drawn in the coordinate plane, with vertices as shown in the diagram. then the square is reflected across the x-axis. -2 4 8. the function that describes the reflection is (x, y) - a. (x, y-3). b. (x, y-6). c. (-x, y). d. (x,- y).
Answers: 2
image
Mathematics, 22.06.2019 02:30, caeyanij
Your weight on the moon is relative to your weight on earth. neil armstrong weighed 360 lbs. in his moon gear while on the earth, but on the moon he only weighed 60 lbs. how much would a 150 lb person weigh on the moon?
Answers: 1
You know the right answer?
HELP I need this finished today and is 100 points! It is a box and whisker plot that needs to show w...

Questions in other subjects:

Konu
Mathematics, 16.10.2019 03:20