Mathematics, 16.04.2020 17:05 Skylynn11
For 133 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 5 bottles. The average across all 665 bottles (133 days, 5 bottles per day) was 60 degrees Fahrenheit. The standard deviation across all bottles was 0.8 degrees. (Round your intermediate calculations and final answer to 4 decimal places.) When constructing an X-bar chart, what would be the upper control limit? not attempted degrees Fahrenheit
Answers: 3
Mathematics, 21.06.2019 17:40, skylerdemi1
A. 127 cm^2 b. 144.5 cm^2 c. 172 cm^2 d. 50 cm^2
Answers: 2
Mathematics, 21.06.2019 21:30, ladydeathanddea
Amira is painting a rectangular banner 2 1/4 yards wide. the banner will have a blue background. amira has enough paint to cover 1 1/2 square yards of the wall. the school colors are blue and yellow, so amira wants to add yellow rectangles on the left and right sides of the blue rectangle. the yellow rectangles will each be 3/4 yards wide and the same height as the blue rectangle. what will be the total area of the two yellow rectangles?
Answers: 3
Mathematics, 21.06.2019 22:00, 24lbriscoe
Astudent has created the give circuit diagram. it consists of a battery, a resistor, and a light bulb. in one minute, 1.2c of charge flows through the resistor. how much charge flows through the light bulb in one minute?
Answers: 1
For 133 consecutive days, a process engineer has measured the temperature of champagne bottles as th...
Mathematics, 18.08.2019 13:50
Geography, 18.08.2019 13:50
Mathematics, 18.08.2019 13:50
History, 18.08.2019 13:50
Social Studies, 18.08.2019 13:50
Mathematics, 18.08.2019 13:50
History, 18.08.2019 13:50
Mathematics, 18.08.2019 13:50