subject
Mathematics, 09.04.2020 17:51 jasmin2344

A company manufactures two types of TV sets, which are

assembled and finished in two workshops W1 and W2. Each

type takes 20 hours and 10 hours for assembly and 5 hours

and 3 hours for finishing in the respective workshops. If total

number of hours available are 450 and 230 in workshops W1

and W2 respectively, Calculate the number of units of each

type be produced, using matrix method only.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, bdog70
Iwill give you ! what is the measure of ∠v ?
Answers: 2
image
Mathematics, 21.06.2019 20:00, heavenwagner
Marcus and cody both leave the park at the same time, but in opposite directions. if cody travels 6 mph faster than marcus and after 4 hours they are 64 miles apart, how fast is each traveling? solve using rare times time = distance.
Answers: 1
image
Mathematics, 21.06.2019 20:30, donnafranks2003
If g^-1(x) is the inverse of g (x) which statement must be true
Answers: 3
image
Mathematics, 21.06.2019 20:40, brayann5761
What is the value of the expression i 0 × i 1 × i 2 × i 3 × i 4? 1 –1 i –i
Answers: 2
You know the right answer?
A company manufactures two types of TV sets, which are

assembled and finished in two wor...

Questions in other subjects:

Konu
Mathematics, 20.05.2021 17:00
Konu
Mathematics, 20.05.2021 17:00