subject
Mathematics, 08.04.2020 19:09 mazolethrin9632

A roofer requires 15 hours to shingle a roof, while an apprentice requires 21 hours. Write
an equation that can be used to find the time in hours, t, it would take to shingle the roof if
both worked together. Solve the equation.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:02, kenna0
Solve for x by completing the square. 2x^2-4x+7=0
Answers: 1
image
Mathematics, 21.06.2019 16:00, pringleosmond
65 8 7 4 5 6 8 4 3 2 1 9 5 6 4 2 1 6 5 1 5 1 3 2 3 5 multiply the third number in the first row by the seventh number in the third row. add this result to the fifth number in the second row. add to this total ten times the fourth number in the third row. subtract the eighth number in the first row from the result.
Answers: 3
image
Mathematics, 21.06.2019 16:30, skylarjohnson2683
What is true about the dilation? it is a reduction with a scale factor between 0 and 1. it is a reduction with a scale factor greater than 1. it is an enlargement with a scale factor between 0 and 1. it is an enlargement with a scale factor greater than 1.
Answers: 2
image
Mathematics, 21.06.2019 17:20, ponylover9655
Read the situations in the table below. then drag a graph and equation to represent each situation. indicate whether each of the relationships is proportional or non-proportional. edit : i got the right answer its attached
Answers: 2
You know the right answer?
A roofer requires 15 hours to shingle a roof, while an apprentice requires 21 hours. Write
an...

Questions in other subjects:

Konu
Arts, 03.02.2022 14:00
Konu
Mathematics, 03.02.2022 14:00
Konu
Computers and Technology, 03.02.2022 14:00