subject
Mathematics, 04.04.2020 00:55 richdakid26

A service process has three stages. The error percentages are: 8% at stage one, 7% at stage two, and 9% at stage three. The connection logic of the three stages is that a good overall outcome happens only when all stages individually have good outcomes. (a)[4] Draw the event tree for this situation with all necessary details. (b)[10] Find the probabilities of defective and good overall outcomes (6 decimals). (c)[2] Calculate and interpret the EPMO of this process (1 decimal). (d)[4] Calculate the sigma level of the process (2 decimals) and state it. Sketch the sigma level.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, taylor511176
Celeste wants to have her hair cut and permed and also go to lunch. she knows she will need $50. the perm cost twice as much as her haircut and she needs $5 for lunch. how much does the perm cost?
Answers: 1
image
Mathematics, 21.06.2019 20:00, genyjoannerubiera
The weight v of an object on venus varies directly with its weight e on earth. a person weighing 120 lb on earth would weigh 106 lb on venus. how much would a person weighing 150 lb on earth weigh on venus?
Answers: 2
image
Mathematics, 21.06.2019 23:50, dbag1162
The federal reserve controls certain interest rates in the united states. investors often try to speculate as to whether the federal reserve will raise or lower rates and by how much. suppose a company conducts extensive interviews with financial analysts, and as a result, predicts that "thefed" will increase rates by an average of 0.25 percentage points every six months for the forseeable future. which type of equation could be used to model the predicted interest rates over the next several years, assuming no other significant changes? a) a linear equation b) a quadratic equation c) a polynomial equation d) an exponential equation
Answers: 3
image
Mathematics, 22.06.2019 01:00, Latoyajenjins1789
Given the net of the rectangular prism, what is its surface area?
Answers: 1
You know the right answer?
A service process has three stages. The error percentages are: 8% at stage one, 7% at stage two, and...

Questions in other subjects:

Konu
Mathematics, 18.03.2021 02:10
Konu
English, 18.03.2021 02:10
Konu
Engineering, 18.03.2021 02:10