5. The time t(in hours) needed to produce x units of a product is modeled by
1 prt s. If it takes 265 hours to produce 200 units and 390 hours to produce
300 units, what is the value of s?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:10, mbatton879
5500 dollars is placed in an account with an annual interest rate of 6.5%. to the nearest tenth of a year, how long will it take for the account value to reach 19700 dollars?
Answers: 2
image
Mathematics, 21.06.2019 18:00, 22justinmcminn
Darian wants to build a regulation size pool table that is 9 feet in length. he plans he ordered are 18 by 36 inches. what is the scale factor of the dilation he must use to build a regulation pool table
Answers: 1
image
Mathematics, 22.06.2019 00:10, angelteddy033
Use your knowledge of the binary number system to write each binary number as a decimal number. a) 1001 base 2= base 10 b) 1101 base 2 = base 10
Answers: 1
image
Mathematics, 22.06.2019 05:40, smith3mgy
Which of the following functions is graphed below?
Answers: 1
You know the right answer?
5. The time t(in hours) needed to produce x units of a product is modeled by
1 prt s. If it ta...

Questions in other subjects: