Mathematics, 31.03.2020 14:56 ana1810

It takes 7 people a total of 10 days to paint a wall. Work out how long it would take 5 people to paint the same wall.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, kaleyf96
Factor the polynomial 4x4 – 20x2 – 3x2 + 15 by grouping. what is the resulting expression? (4x2 + 3)(x2 – 5) (4x2 – 3)(x2 – 5) (4x2 – 5)(x2 + 3) (4x2 + 5)(x2 – 3)
Answers: 1
image
Mathematics, 21.06.2019 21:30, Caixiayang3613
Look at the figure below: triangle abc is a right triangle with angle abc equal to 90 degrees. the length of ac is 5 units and the length of ab is 4 units. d is a point above c. triangle adc is a right triangle with angle dac equal to 90 degrees and dc parallel to ab. what is the length, in units, of segment cd?
Answers: 1
image
Mathematics, 21.06.2019 21:50, gwendallinesikes
Ab and bc are tangent to circle d. find x is ab = 3x + 8 and bc = 26. find x
Answers: 1
image
Mathematics, 21.06.2019 23:40, breannaasmith1122
Me d is also an option but i couldn't get it in the picture
Answers: 2
You know the right answer?
It takes 7 people a total of 10 days to paint a wall. Work out how long it would take 5 people to pa...

Questions in other subjects:

Konu
Mathematics, 18.11.2020 18:30