subject
Mathematics, 31.03.2020 02:22 yeetusbobeetus

A project has a mean completion time of 54 weeks and a standard deviation of the project completion time of 2.95 weeks. What is the probability of completing the project within 52 weeks? Please put your answer in terms of a probability (i. e. a number between 0 and 1), and not a percentage.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:30, Travon6524
Ten members of balin's soccer team ran warm ups for practice. each member ran the same distance. their combined distance was 5/6 of a mile. to find the distance that each member ran, balin wrote the expression below.
Answers: 3
image
Mathematics, 21.06.2019 21:30, achsahjosey
Acyclist bike x distance at 10 miles per hour .and returns over the same path at 8 miles per hour. what is the cyclist average rate for the round trip in miles per hour ?
Answers: 1
image
Mathematics, 21.06.2019 22:00, nshuey0930
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 2
image
Mathematics, 22.06.2019 00:30, princeton
What should be done to both sides of the equation in order to solve -5m = -40? a) multiply by -5. b) divide by -5. c) multiply by -40. d) divide by -40.
Answers: 2
You know the right answer?
A project has a mean completion time of 54 weeks and a standard deviation of the project completion...

Questions in other subjects:

Konu
Mathematics, 01.08.2019 20:00