4. (Minimization): G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major appliance manufacturer. Although two models of motors exist, the finished models are indistinguishable from one another; their cost difference is due to a different production sequence. The time in hours required for each model in each production area is tabled here, along with the labor cost. Model 1 Model 2 Area A 15 3 Area B 4 10 Area C 4 8 Cost 80 65 Currently labor assignments provide for 10,000 hours in each of Areas A and B and 18000 hours in Area C. If 2000 hours are available to be transferred from area B to Area A, 3000 hours are available to be transferred from area C to either Areas A or B, develop the linear programming model whose solution would tell G&P how many of each model to produce and how to allocate the workforce.
Answers: 3
Mathematics, 22.06.2019 03:30, amiechap12
Given the equation  = 5, solve for x and identify if it is an extraneous solution
Answers: 2
4. (Minimization): G and P Manufacturing would like to minimize the labor cost of producing dishwash...
Spanish, 13.07.2019 16:00
Health, 13.07.2019 16:00
Mathematics, 13.07.2019 16:00
Spanish, 13.07.2019 16:00
Business, 13.07.2019 16:00
Spanish, 13.07.2019 16:00