subject
Mathematics, 30.03.2020 16:53 quinshayewilli3329

4. (Minimization): G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major appliance manufacturer. Although two models of motors exist, the finished models are indistinguishable from one another; their cost difference is due to a different production sequence. The time in hours required for each model in each production area is tabled here, along with the labor cost. Model 1 Model 2 Area A 15 3 Area B 4 10 Area C 4 8 Cost 80 65 Currently labor assignments provide for 10,000 hours in each of Areas A and B and 18000 hours in Area C. If 2000 hours are available to be transferred from area B to Area A, 3000 hours are available to be transferred from area C to either Areas A or B, develop the linear programming model whose solution would tell G&P how many of each model to produce and how to allocate the workforce.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:00, travisvb
What unit of been sure would be appropriate for the volume of a sphere with a radius of 2 meters
Answers: 2
image
Mathematics, 22.06.2019 03:30, amiechap12
Given the equation    = 5, solve for x and identify if it is an extraneous solution
Answers: 2
image
Mathematics, 22.06.2019 04:20, idk7193
The range of the following relation r {(3, -5), (1, 2), (-1, -4), (-1, 2)} is (1 point){-4, -5, 2, 2){-1, 1, 3){-1,-1,1,3){-5, -4,2)
Answers: 1
image
Mathematics, 22.06.2019 04:30, hokamidat
What is the correct answer?urgent you
Answers: 2
You know the right answer?
4. (Minimization): G and P Manufacturing would like to minimize the labor cost of producing dishwash...

Questions in other subjects: