9. Triangle Construction pays Square Insurance $5,980
to insure a construction site for 92 days. To extend the
insurance beyond the 92 days costs $97 per day. At the end of this period, if Triangle extends the insurance by 1 day, how much more does Triangle pay for that day than it paid per day during the first period of time?
A. $5
$32
C. $37
D. $65
E. $67

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, tylorroundy
Nick estimated that 5/8+4/7 is about 2.explain how you know his estimate is not reasonable plz and fast i will give 50 points
Answers: 2
image
Mathematics, 21.06.2019 21:00, kdawg203
Yahir designs bracelets. he uses between 9 and 15 red and yellow beads in the ratio of 2 red bead to 5 yellow beads. drag the beads into the container to meet these requirements
Answers: 2
image
Mathematics, 21.06.2019 23:30, math3130
Which number is located at point a on the number line? a number line is shown from negative 10 to 10 with each interval mark on the number line representing one unit. point a is labeled one interval mark to the right of negative 5.
Answers: 1
image
Mathematics, 22.06.2019 00:20, kellygaytan
20 ! need ! which exponential function is represented by the table? f(x) = 0.2(0.5x)f(x) = 0.5(5x)f(x) = 0.5(0.2x)f(x) = 0.2(0.2x)
Answers: 1
You know the right answer?
9. Triangle Construction pays Square Insurance $5,980
to insure a construction site for 92 day...

Questions in other subjects:

Konu
English, 31.03.2020 00:13