Mathematics, 28.03.2020 20:34 talia43
The following twelve-task production line should produce 960 units daily. Assume it works 3 eight-hour
shifts daily. The twelve tasks, with times and precedence requirements are shown in the following table:The following twelve-task production line should produce 960 units daily. Assume it works 3 eight-hour
shifts daily. The twelve tasks, with times and precedence requirements are shown in the following table: