P = Predecessor S = Successor

This dependency states that you can start the successor after you start the predecessor. There is overlap between the two activities because you don't require 100% of the predecessor to be complete before starting the successor. Creating overlap will shorten the schedule, but it also increases risk. If something happens in the predecessor that impacts what you've already built in the successor, you'll end up redoing the successor work. The assumption with the SS dependency is moving both activities to start as soon as possible.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, jamesgraham577
Which transformations could have occurred to map △abc to △a"b"c"? a rotation and a reflection a translation and a dilation a reflection and a dilation a dilation and a rotation
Answers: 1
image
Mathematics, 21.06.2019 14:30, kadrian12
Graph the system: f(x)= 3/x-2; f(x)= 1/2x + 2
Answers: 3
image
Mathematics, 21.06.2019 16:40, dubouuu
Which data set has a greater spread? why? set a: {38, 12, 23, 48, 55, 16, 18} set b: {44, 13, 24, 12, 56} has a greater spread because .
Answers: 2
image
Mathematics, 21.06.2019 18:30, veheca
According to the 2008 u. s. census, california had a population of approximately 4 × 10^7 people and florida had a population of approximately 2 × 10^7 people. which of the following is true? a. the population of florida was approximately two times the population of california. b. the population of florida was approximately twenty times the population of california. c. the population of california was approximately twenty times the population of florida. d. the population of california was approximately two times the population of florida.
Answers: 1
You know the right answer?
P = Predecessor S = Successor

This dependency states that you can start the successor af...

Questions in other subjects: