P = Predecessor S = Successor
This dependency states that you can start the successor af...
Mathematics, 25.03.2020 18:25 avelyp
P = Predecessor S = Successor
This dependency states that you can start the successor after you start the predecessor. There is overlap between the two activities because you don't require 100% of the predecessor to be complete before starting the successor. Creating overlap will shorten the schedule, but it also increases risk. If something happens in the predecessor that impacts what you've already built in the successor, you'll end up redoing the successor work. The assumption with the SS dependency is moving both activities to start as soon as possible.
Answers: 2
Mathematics, 21.06.2019 13:30, jamesgraham577
Which transformations could have occurred to map △abc to △a"b"c"? a rotation and a reflection a translation and a dilation a reflection and a dilation a dilation and a rotation
Answers: 1
Mathematics, 21.06.2019 18:30, veheca
According to the 2008 u. s. census, california had a population of approximately 4 × 10^7 people and florida had a population of approximately 2 × 10^7 people. which of the following is true? a. the population of florida was approximately two times the population of california. b. the population of florida was approximately twenty times the population of california. c. the population of california was approximately twenty times the population of florida. d. the population of california was approximately two times the population of florida.
Answers: 1
Social Studies, 15.08.2020 03:01
Chemistry, 15.08.2020 03:01