subject
Mathematics, 24.03.2020 20:52 tati7149

A contractor estimated that one of his two bricklayers would take 9 hours to build a certain wall and the other 10 hours. However, he knew from experience that when they worked together, 10 fewer bricks got laid per hour. Since he was in a hurry, he put both men on the job and found it took exactly 5 hours to build the wall. How many bricks did it contain?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, sarahlearn3
Write the converse of the following statement: if the trees have no leaves, then it is fall. if the trees have no leaves, then it is fall. the trees have no leaves, therefore it is fall. it is fall since the trees have no leaves. if it is fall, then the trees have no leaves.
Answers: 2
image
Mathematics, 21.06.2019 17:10, Playboycxm
Consider the following equation -167 + 37 = 49 - 21p select the equation that has the same solution as the given equation. o a. p - 5 + ip = 7 - p ob. +55 + 12p = 5p + 16 c. 2 + 1.25p = -3.75p + 10 d. -14 + 6p = -9 - 6p reset next
Answers: 3
image
Mathematics, 21.06.2019 19:10, niyah2x3
What are the coordinates of the point that is 1/3 of the way from a to b? a (2,-3) b (2,6)
Answers: 3
image
Mathematics, 21.06.2019 19:40, evarod
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
You know the right answer?
A contractor estimated that one of his two bricklayers would take 9 hours to build a certain wall an...

Questions in other subjects:

Konu
Mathematics, 21.12.2020 18:20
Konu
Mathematics, 21.12.2020 18:20