Mathematics, 24.03.2020 19:16 heyheyhola
A small manufacturer makes two types of motors, models A and B. The assembly process for each is similar in that both require a certain amount of wiring, drilling, and assembly. Each model A takes 3 hours of wiring, 2 hours of drilling, and 1.5 hours of assembly. Each model B must go through 2 hours of wiring, 1 hour of drilling, and 0.5 hours of assembly. During the next production period, 240 hours of wiring time, 210 hours of drilling time, and 120 hours of assembly time are available. Each model A sold yields a profit of $22. Each model B can be sold for a $15 profit. Assuming that all motors that are assembled can be sold, find the best combination of motors to yield the highest profit.
Answers: 2
Mathematics, 21.06.2019 19:20, axelsanchez7710
The suare root of 9x plus 7 plus the square rot of 2x equall to 7
Answers: 1
Mathematics, 21.06.2019 22:00, fatherbamboo
Liz is shipping a package to her friend. the maximum weight of a medium flat-rate box is 20 pounds, including the box which weighs 6 ounces. write and solve an inequality to describe the possible weight in pounds, w, of the contents that liz will ship to her friend if she must use a medium flat-rate box. use the drop-down menus to explain your answer.
Answers: 2
Mathematics, 21.06.2019 22:30, lilmaddy8856
Which expressions equal 9 when x=4 and y=1/3 a. x2+6y b. 2x + 3y c. y2-21x d. 5 (x/2) -3y e. 3x-9y
Answers: 2
Mathematics, 22.06.2019 01:00, oliviastokes
Urgent? will give brainliest to the first correct answer what is the area of the figure?
Answers: 3
A small manufacturer makes two types of motors, models A and B. The assembly process for each is sim...
Biology, 04.03.2020 23:49
Mathematics, 04.03.2020 23:49
Mathematics, 04.03.2020 23:49